快捷方式:将项目移至积压工作的顶部
Shortcut: Move an item to the top of the backlog
根据 documentation,我应该可以通过 CTRL将一个项目移到待办列表的顶部 + 首页。我可以通过拖放手动完成,但快捷方式似乎不起作用。你们是快捷方式有问题还是我做错了什么?
我能够重现您的问题,并且我已在下面的 link 提交了反馈,请按照 link 进行任何更新。:
来自产品团队的更新:
We have created a bug for the engineering team to address as time
permits. Because of the nature of the issue, it is going to be a lower
priority bug for us. But we hope to get it addressed in the next few
sprints.
根据 documentation,我应该可以通过 CTRL将一个项目移到待办列表的顶部 + 首页。我可以通过拖放手动完成,但快捷方式似乎不起作用。你们是快捷方式有问题还是我做错了什么?
我能够重现您的问题,并且我已在下面的 link 提交了反馈,请按照 link 进行任何更新。:
来自产品团队的更新:
We have created a bug for the engineering team to address as time permits. Because of the nature of the issue, it is going to be a lower priority bug for us. But we hope to get it addressed in the next few sprints.