Control-M 中的 CYC 和 ECJ 任务类型有什么区别?

What is the difference between an CYC and ECJ Task type in Control-M?

我在用户手册和用户指南中搜索了 z/OS,但找不到关于什么是 ECJ - 紧急循环作业以及与 CYC 作业有何区别的任何解释。

谢谢

我在 Control-M z/OS V6.2 用户指南,第 680 页,主题 紧急工作和已开始的任务

Note: Emergency jobs and started tasks are supported for backward compatibility, but BMC Software recommends redefining them as regular jobs and started tasks that are activated by DO FORCEJOB statements. CONTROL-M/Restart users can also use a DO IFRERUN statement. The DO FORCEJOB statement is described in “DO FORCEJOB: Post–Processing Parameter” on page 463, and the DO IFRERUN statement in “§Restart§DO IFRERUN: Post–Processing Parameter” on page 467.

An emergency job or emergency started task can be used to overcome any irregularities in normal execution. The job remains in the Active Jobs file, waiting to be scheduled, until all regular jobs of the same GROUP finish executing OK and are checked by CONTROL-M. Then, when the emergency job is no longer needed, the job is automatically removed from the Active Jobs file. For additional information, see “MAXWAIT: Basic Scheduling Parameter” on page 539.

6.2 版是 2014 年或更早的版本。当 Emergeny Jobs/STC 是标准用法时,您可能想要查找更早版本的手册。

但上面文字的措辞似乎表明您不想定义紧急循环作业。这似乎是一个过时的功能。

我退休了,无法再使用 Control-M 的系统,而且我不记得曾经见过紧急类型的工作或 STC(周期性或非周期性)。我在我的电脑上发现了 V6.2 手册作为遗留物。